Moreletaspruit Outfall Sewer Rehabilitation Program

Sewer works on May 2013

This Moreletaspruit Outfall Sewer Rehabilitation Program PDF contains all the latest information about the rehabilitation of the sewer works in the Faerie Glen Nature reserve.

The entire new sewer system is currently being monitored with CCTV to ensure that pipes are properly sealed and that the gradients are correct. The old sewer system will be redirected to the new sewer system when this testing phase is complete.

The area showed in the photograph is in the south-eastern corner of the Faerie Glen Nature Reserve. Tie-ins and final extensions to the existing sewer system still have to take place here. Work in this area can only continue when the water table drops low enough to allow construction to proceed without the risk of trench walls collapsing.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s