Monday 7 Nov 2016 – Bridge closing for repairs

20160705_095412

Please note the long bridge in the middle of the reserve will be CLOSED for foundation repairs from Monday 7 Nov 2016. Weather depending the repairs should be completed within a week.

If you do need to use this specific route the original shallow river crossing close to the bridge is an option for the fit wearing proper hiking boots.

20160708_101502

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s